Difference between revisions of "2010-11"

From OCE Space Simulation
Jump to: navigation, search
m (Task Forces: you get the point. Just changing some memberships and removing the proposed tag from one etc.)
m (Task Forces)
 
(9 intermediate revisions by 5 users not shown)
Line 8: Line 8:
 
| webmaster = Chen-tao LaRochelle
 
| webmaster = Chen-tao LaRochelle
 
| archivemaster = Alex Mendes
 
| archivemaster = Alex Mendes
| wikimaster = Max Jeffcott
+
| wikimaster = rotational basis
 
| tech = Arrian Amir-Rafiei
 
| tech = Arrian Amir-Rafiei
| quartermaster = TBD
+
| quartermaster = rotational basis
| officemaster = Matthew Pelletier
+
| officemaster = rotational basis
| mission = TBD
+
| mission = Drake-Sagan 2011
| destination = TBD
+
| destination = Gliese 581 g
| dates = TBD
+
| dates = February 29 - March 4, 2011
 
| location = 440 Albert
 
| location = 440 Albert
 
| membership = ~45
 
| membership = ~45
 
}}
 
}}
  
'''2010-11''' is the current school year.
+
'''2010-11''' is the year in which:
  
==Firsts==
+
* The new [[Administration|hierarchy]] was proposed in the [[2010 Proposal to Change the Hierarchy]].
* The first year of the new [[Administration|hierarchy]] proposed in the [[2010 Proposal to Change the Hierarchy]].
+
* The year of conduits/in-[[habitat]] patch panel. This was the result of a complete revamp of the [[Alpha]] Systems. Although it was prompted by the [[School Board]] and consumed the first semester of [[worksessions]], it resulted in an entire network of conduits and tracks, as well as the installation in [[Command and Control]] of a large patch panel. This allows the [[astronauts]] to actively replace parts of the network or phones by switching cables or switching the ports used (which of course must be accompanied by a corresponding switch on the other end, leading to an increased necessity for communication in the solving of [[Beta]] problems), and it means a better and more organised system with more fail-safes.
* Training is planned to be revamped, with proper [[Task Force]] leaders constantly in charge of training members in various stations.
+
* Training was planned to be revamped, with proper [[Task Force]] leaders constantly in charge of training members in various stations.
* EEPs are planned to be brought back for the first time since [[2005-06]].
+
* EEPs were planned to be brought back for the first time since [[2005-06]].
* Training Missions are planned to be revamped; instead of semi-regular training missions, workshops will be held as they were a decade ago and longer. Members will sign up or be selected for a [[work session]]-long workshop on certain tasks necessary for Spacesim.
+
* Training Missions were planned to be revamped; instead of semi-regular training missions, workshops will be held as they were a decade ago and longer. Members will sign up or be selected for a [[work session]]-long workshop on certain tasks necessary for Spacesim.
* The first [[Automated Mission]] is planned for this year.
+
* The first [[Automated Mission]] was launched in this year.
* The first educational seminars were held in recent history.
+
* The first [[educational seminars]] were held in recent history.
 
* The first mission to a location outside our solar system.
 
* The first mission to a location outside our solar system.
 
+
* The first [[workshops]] at a work session were conducted since at least [[1999-00|10 years before]] (the only remaining knowledge of workshops comes from a hand-scrawled note, in a color of ink and a style of handwriting [blue, large cursive] similar to that of the venerable [[Milary]], found in [[Keplernicus]]. Because of this it is theorized that the [[OCESS]] had no training worksessions for at least [[1994-95|15 years before]] the one on February 4, 2011).
  
  
Line 51: Line 51:
 
{{TF|name=Orbit Training|lead=Arrian Amir-Rafiei|purp=To train members in use of all [[Orbit]] software.|memb=Everyone}}
 
{{TF|name=Orbit Training|lead=Arrian Amir-Rafiei|purp=To train members in use of all [[Orbit]] software.|memb=Everyone}}
  
{{TF|name=Realism (Proposed)|lead=Chen-tao LaRochelle|purp=To embellish the [[Hab]] for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab.|memb=[[Sam Downs]], [[Nick Goddard]], [[Chen-tao LaRochelle]], [[Amanda McColl]]}}
+
{{TF|name=Realism|lead=Chen-tao LaRochelle|purp=To embellish the [[Hab]] for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab.|memb=[[Sam Downs]], [[Nick Goddard]], [[Chen-tao LaRochelle]], [[Amanda McColl]]}}
 +
 
 +
{{TF|name=[[Automated Mission]] Development|lead=Samuel Baltz|purp=Come up with goals, procedures, and methods for the automated mission. |memb=[[Ben Paul]], [[Jibril Jeewanjee]], [[Max Jeffcott]], [[Matt Dunbar]], [[Lawrence Maroun]]}}
  
{{TF|name=Veil of Darkness (proposed)|lead=Bryce Storey|purp=Create "more fancy" planetary surface constructs.|memb=TBD}}
+
{{TF|name=Veil of Darkness (proposed)|lead=Lyra Evans|purp=Create "more fancy" planetary surface constructs.|memb=TBD}}
  
 
{{History
 
{{History

Latest revision as of 17:06, 27 November 2015


2010-11
Admiral Jim Magwood
Mission Commander Ian Martin
Deputy Mission Commander Olivia Frank
Education Commander Samuel Baltz
Deputy Education Commander Nick Eglin
External Affairs Subcommander Euan Wheaton
Director of Web and Archives Chen-tao LaRochelle
Archivemaster Alex Mendes
Wikimaster rotational basis
Director of Tech and Engineering Arrian Amir-Rafiei
Quartermaster rotational basis
Officemaster rotational basis
Mission Patch: TBD
Mission Name Drake-Sagan 2011
Mission Destination Gliese 581 g
Mission Dates February 29 - March 4, 2011
Location 440 Albert
Membership ~45

'


2010-11 is the year in which:

  • The new hierarchy was proposed in the 2010 Proposal to Change the Hierarchy.
  • The year of conduits/in-habitat patch panel. This was the result of a complete revamp of the Alpha Systems. Although it was prompted by the School Board and consumed the first semester of worksessions, it resulted in an entire network of conduits and tracks, as well as the installation in Command and Control of a large patch panel. This allows the astronauts to actively replace parts of the network or phones by switching cables or switching the ports used (which of course must be accompanied by a corresponding switch on the other end, leading to an increased necessity for communication in the solving of Beta problems), and it means a better and more organised system with more fail-safes.
  • Training was planned to be revamped, with proper Task Force leaders constantly in charge of training members in various stations.
  • EEPs were planned to be brought back for the first time since 2005-06.
  • Training Missions were planned to be revamped; instead of semi-regular training missions, workshops will be held as they were a decade ago and longer. Members will sign up or be selected for a work session-long workshop on certain tasks necessary for Spacesim.
  • The first Automated Mission was launched in this year.
  • The first educational seminars were held in recent history.
  • The first mission to a location outside our solar system.
  • The first workshops at a work session were conducted since at least 10 years before (the only remaining knowledge of workshops comes from a hand-scrawled note, in a color of ink and a style of handwriting [blue, large cursive] similar to that of the venerable Milary, found in Keplernicus. Because of this it is theorized that the OCESS had no training worksessions for at least 15 years before the one on February 4, 2011).







Task Forces

Airtight Habitat (proposed)
Leader TBD
Purpose To make the Hawking II more "airtight," especially with regard to the doors.
Members TBD


EEPs Training
Leader Samuel Baltz
Purpose To get members ready to conduct EEPs.
Members Everyone


Orbit Training
Leader Arrian Amir-Rafiei
Purpose To train members in use of all Orbit software.
Members Everyone


Realism
Leader Chen-tao LaRochelle
Purpose To embellish the Hab for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab.
Members Sam Downs, Nick Goddard, Chen-tao LaRochelle, Amanda McColl


Automated Mission Development
Leader Samuel Baltz
Purpose Come up with goals, procedures, and methods for the automated mission.
Members Ben Paul, Jibril Jeewanjee, Max Jeffcott, Matt Dunbar, Lawrence Maroun


Veil of Darkness (proposed)
Leader Lyra Evans
Purpose Create "more fancy" planetary surface constructs.
Members TBD
Previous Year This Year Next Year
2009-10 2010-11 2011-12