Difference between revisions of "2010-11"
From OCE Space Simulation
Cslatlantis (Talk | contribs) (Newest Task Force added, as well as a bit of formatting.) |
m (→Task Forces: you get the point. Just changing some memberships and removing the proposed tag from one etc.) |
||
Line 47: | Line 47: | ||
{{TF|name=Airtight Habitat (proposed)|lead=TBD|purp=To make the Hawking II more "airtight," especially with regard to the doors.|memb=TBD}} | {{TF|name=Airtight Habitat (proposed)|lead=TBD|purp=To make the Hawking II more "airtight," especially with regard to the doors.|memb=TBD}} | ||
− | {{TF|name=EEPs Training | + | {{TF|name=EEPs Training|lead=Samuel Baltz|purp=To get members ready to conduct [[EEPs]].|memb= Everyone }} |
− | {{TF|name=Orbit Training |lead=Arrian Amir-Rafiei|purp=To train members in use of all [[Orbit]] software.|memb=Everyone}} | + | {{TF|name=Orbit Training|lead=Arrian Amir-Rafiei|purp=To train members in use of all [[Orbit]] software.|memb=Everyone}} |
− | {{TF|name=Realism|lead=Chen-tao LaRochelle|purp=To embellish the [[Hab]] for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab.|memb=[[Sam Downs]], [[Nick Goddard]], [[Chen-tao LaRochelle]], [[Amanda McColl]]}} | + | {{TF|name=Realism (Proposed)|lead=Chen-tao LaRochelle|purp=To embellish the [[Hab]] for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab.|memb=[[Sam Downs]], [[Nick Goddard]], [[Chen-tao LaRochelle]], [[Amanda McColl]]}} |
{{TF|name=Veil of Darkness (proposed)|lead=Bryce Storey|purp=Create "more fancy" planetary surface constructs.|memb=TBD}} | {{TF|name=Veil of Darkness (proposed)|lead=Bryce Storey|purp=Create "more fancy" planetary surface constructs.|memb=TBD}} |
Revision as of 12:01, 9 November 2010
2010-11 is the current school year.
Firsts
- The first year of the new hierarchy proposed in the 2010 Proposal to Change the Hierarchy.
- Training is planned to be revamped, with proper Task Force leaders constantly in charge of training members in various stations.
- EEPs are planned to be brought back for the first time since 2005-06.
- Training Missions are planned to be revamped; instead of semi-regular training missions, workshops will be held as they were a decade ago and longer. Members will sign up or be selected for a work session-long workshop on certain tasks necessary for Spacesim.
- The first Automated Mission is planned for this year.
- The first educational seminars were held in recent history.
- The first mission to a location outside our solar system.
Task Forces
Airtight Habitat (proposed) | |
---|---|
Leader | TBD |
Purpose | To make the Hawking II more "airtight," especially with regard to the doors. |
Members | TBD |
EEPs Training | |
---|---|
Leader | Samuel Baltz |
Purpose | To get members ready to conduct EEPs. |
Members | Everyone |
Orbit Training | |
---|---|
Leader | Arrian Amir-Rafiei |
Purpose | To train members in use of all Orbit software. |
Members | Everyone |
Realism (Proposed) | |
---|---|
Leader | Chen-tao LaRochelle |
Purpose | To embellish the Hab for the purpose of the simulation: engines will be added as well as creating an outer hull to the Hab. |
Members | Sam Downs, Nick Goddard, Chen-tao LaRochelle, Amanda McColl |
Veil of Darkness (proposed) | |
---|---|
Leader | Bryce Storey |
Purpose | Create "more fancy" planetary surface constructs. |
Members | TBD |
Previous Year | This Year | Next Year |
---|---|---|
2009-10 | 2010-11 | 2011-12 |