Difference between revisions of "2010-11"
From OCE Space Simulation
m |
m (Needed a cleaning up.) |
||
Line 8: | Line 8: | ||
| webmaster = Chen-tao LaRochelle | | webmaster = Chen-tao LaRochelle | ||
| archivemaster = Alex Mendes | | archivemaster = Alex Mendes | ||
− | | wikimaster = | + | | wikimaster = Max Jeffcott |
| tech = Arrian Amir-Rafiei | | tech = Arrian Amir-Rafiei | ||
| quartermaster = TBD | | quartermaster = TBD | ||
− | | officemaster = | + | | officemaster = Matthew Pelletier |
| mission = TBD | | mission = TBD | ||
| destination = TBD | | destination = TBD | ||
| dates = TBD | | dates = TBD | ||
| location = 440 Albert | | location = 440 Albert | ||
− | | membership = | + | | membership = ~45 |
}} | }} | ||
Line 36: | Line 36: | ||
{{TF|name=EEPs Training (proposed)|lead=Samuel Baltz|purp=To get members ready to conduct [[EEPs]].|memb=[[Arrian Amir-Rafiei]]}} | {{TF|name=EEPs Training (proposed)|lead=Samuel Baltz|purp=To get members ready to conduct [[EEPs]].|memb=[[Arrian Amir-Rafiei]]}} | ||
− | {{TF|name=Orbit Training | + | {{TF|name=Orbit Training lead=Arrian Amir-Rafiei|purp=To train members in use of all [[Orbit]] software.|memb=Everyone}} |
{{TF|name=Veil of Darkness (proposed)|lead=Bryce Storey|purp=Create "more fancy" planetary surface constructs.|memb=TBD}} | {{TF|name=Veil of Darkness (proposed)|lead=Bryce Storey|purp=Create "more fancy" planetary surface constructs.|memb=TBD}} |
Revision as of 14:21, 21 October 2010
2010-11 is the current school year.
Firsts
- The first year of the new hierarchy proposed in the 2010 Proposal to Change the Hierarchy.
- Training is planned to be revamped, with proper Task Force leaders constantly in charge of training members in various stations.
- EEPs are planned to be brought back for the first time since 2005-06.
- Training Missions are planned to be revamped; instead of semi-regular training missions, workshops will be held as they were a decade ago and longer. Members will sign up or be selected for a work session-long workshop on certain tasks necessary for Spacesim.
- The first Automated Mission is planned for this year.
- The first educational seminars were held in recent history.
- The first mission to a location outside our solar system.
Task Forces
Airtight Habitat (proposed) | |
---|---|
Leader | TBD |
Purpose | To make the Hawking II more "airtight," especially with regard to the doors. |
Members | TBD |
EEPs Training (proposed) | |
---|---|
Leader | Samuel Baltz |
Purpose | To get members ready to conduct EEPs. |
Members | Arrian Amir-Rafiei |
Orbit Training lead=Arrian Amir-Rafiei | |
---|---|
Leader | Leader Unknown |
Purpose | To train members in use of all Orbit software. |
Members | Everyone |
Veil of Darkness (proposed) | |
---|---|
Leader | Bryce Storey |
Purpose | Create "more fancy" planetary surface constructs. |
Members | TBD |
Previous Year | This Year | Next Year |
---|---|---|
2009-10 | 2010-11 | 2011-12 |