Difference between revisions of "Red Dawn 2008"

From OCE Space Simulation
Jump to: navigation, search
(Fixing link)
 
(10 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{mission | missionpatch = Mission Patch Not Available
+
{{missiony
| name = Red Dawn
+
 
| year = 2007-08
 
| year = 2007-08
 
| destination = Mars
 
| destination = Mars
 
| dates = 26-02-2008 to 3-01-08
 
| dates = 26-02-2008 to 3-01-08
 
| habcom = [[Nevin Hotson]]
 
| habcom = [[Nevin Hotson]]
| pilot = [[Anthony Xing]]
+
| subcom = [[Anthony Xing]]
| engineer = [[Matt Farkas-Dyck]]
+
| mccom = [[Jeff Gao]]
| payspecs = [[Maclean Rouble]], [[Daisy Wong]], [[Ben Paul]]
+
| simcom = [[Lyra Evans]]
| astros = none
+
| crew =Astros_2008.jpg
 
}}
 
}}
  
The '''2008 Mission to Mars''', or '''Mission Red Dawn''', was the first [[mission]] run using the [[Engineering Closet|Engine Closet]] and the new, smaller [[Hotlab]]. Other new things used on this mission included:
+
The '''2008 Mission to Mars''', or '''Mission Red Dawn''', was the first [[mission]] run using the [[Engineering Closet]] and the new, smaller [[Hotlab]]. Other changes for this mission included:
* A new version of the [[Orbit]] software implementing solid rocket boosters (for terrestrial liftoff) and a reusable parachute (for atmospheric reentry).
+
* A new version of the [[Orbit]] software implementing solid rocket boosters (SRBs) for terrestrial liftoff and a reusable parachute for atmospheric reentry.
 
* A new, more comfortable [[EVA suit]].
 
* A new, more comfortable [[EVA suit]].
 +
 +
Red Dawn was also the final mission in the Hawking II.
 +
 +
==Astronauts==
 +
* [[Nevin Hotson]] ([[Habitat Commander]])
 +
* [[Anthony Xing]] ([[Subcommander]])
 +
* [[Daisy Wong]] ([[Medic]])
 +
* Maclean Rouble ([[Co-Pilot]])
 +
* [[Matthew Farkas-Dyck]] ([[Engineer]])
 +
* [[Ben Paul]] ([[Communications Specialist]])
  
 
==Experiments==
 
==Experiments==
 
Experiments were performed on the following subjects:
 
Experiments were performed on the following subjects:
* how does tiredness affect mental ability?
+
* effects of fatigue on mental ability
* how do different genres of music affect mental ability and heart rate?
+
* effects of music on mental ability and heart rate
* how do distracting stimuli affect mental ability?
+
* effects of distracting stimuli on mental ability
* how have thirty years on the Martian surface affected the Viking I lander?
+
* effects of longterm exposure to the Martian environment on the Viking I lander
Additionally, due to an emergeny situation inspired by the loss of 30% of the [[Habitat]]'s wash-water stores, an attempt was made to build a Sabatier reactor to produce additional water from the Martian atmosphere. This experiment was a partial success, as water was produced, but could not be retrieved due to extreme Martian weather.
+
 
 +
Additionally, due to the emergency situation of the loss of 30% of the [[Habitat]]'s water stores, an attempt was made to build a Sabatier reactor to produce additional water using the Martian atmosphere. This experiment was a partial success, as water was produced but could not be retrieved due to extreme weather conditions.
 +
 
  
Data from these experiments is still being processed, and will be released once conclusions have been drawn.
 
  
 
==Notable Events==
 
==Notable Events==
 
* CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February.
 
* CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February.
* Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions
+
* Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions.
 
* All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved.
 
* All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved.
 
* A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor.
 
* A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor.
Line 34: Line 44:
 
==See Also==
 
==See Also==
 
* [http://www.spacesim.org/Spacesim/Mission/mission(head_page).htm The Spacesim website page on this mission]
 
* [http://www.spacesim.org/Spacesim/Mission/mission(head_page).htm The Spacesim website page on this mission]
 +
 +
{{navm
 +
|PrevMiss = Coronis 2007
 +
|NextMiss = Genesis 2009
 +
}}

Latest revision as of 16:33, 31 May 2019

{{{missionpatch}}}
Red Dawn 2008
Year 2007-08
Mission Destination Mars
Mission Dates 26-02-2008 to 3-01-08
Habitat Commander Nevin Hotson
Subcommander Anthony Xing
Mission Control Commander Jeff Gao
Simulator Commander Lyra Evans
Astros 2008.jpg


The 2008 Mission to Mars, or Mission Red Dawn, was the first mission run using the Engineering Closet and the new, smaller Hotlab. Other changes for this mission included:

  • A new version of the Orbit software implementing solid rocket boosters (SRBs) for terrestrial liftoff and a reusable parachute for atmospheric reentry.
  • A new, more comfortable EVA suit.

Red Dawn was also the final mission in the Hawking II.

Astronauts

Experiments

Experiments were performed on the following subjects:

  • effects of fatigue on mental ability
  • effects of music on mental ability and heart rate
  • effects of distracting stimuli on mental ability
  • effects of longterm exposure to the Martian environment on the Viking I lander

Additionally, due to the emergency situation of the loss of 30% of the Habitat's water stores, an attempt was made to build a Sabatier reactor to produce additional water using the Martian atmosphere. This experiment was a partial success, as water was produced but could not be retrieved due to extreme weather conditions.


Notable Events

  • CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February.
  • Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions.
  • All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved.
  • A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor.
  • A powerful storm on the last night briefly incapacitated Cdr Hotson and Lt Rouble while they were on EVA to collect the water produced by the Sabatier reactor; however, Lt Cdr Xing was able to retrieve them safely.
  • Landing at the OCESS facilities in Ottawa was at approximately 1415 EST; initial reentry was over Chicago, which was judged not to be an optimal landing site.

See Also

Previous Mission This Mission Next Mission
Coronis 2007 Red Dawn 2008 Genesis 2009