Difference between revisions of "Red Dawn 2008"
From OCE Space Simulation
m (Red Dawn moved to Red Dawn 2008: Proper mission format) |
JimMagwood (Talk | contribs) |
||
(11 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
− | {{ | + | {{missiony |
− | + | ||
| year = 2007-08 | | year = 2007-08 | ||
| destination = Mars | | destination = Mars | ||
| dates = 26-02-2008 to 3-01-08 | | dates = 26-02-2008 to 3-01-08 | ||
| habcom = [[Nevin Hotson]] | | habcom = [[Nevin Hotson]] | ||
− | | | + | | subcom = [[Anthony Xing]] |
− | | | + | | mccom = [[Jeff Gao]] |
− | | | + | | simcom = [[Lyra Evans]] |
− | | | + | | crew =Astros_2008.jpg |
}} | }} | ||
− | The '''2008 Mission to Mars''', or '''Mission Red Dawn''', was the first [[mission]] run using the [[ | + | The '''2008 Mission to Mars''', or '''Mission Red Dawn''', was the first [[mission]] run using the [[Engineering Closet]] and the new, smaller [[Hotlab]]. Other changes for this mission included: |
− | * A new version of the [[Orbit]] software implementing solid rocket boosters (for terrestrial liftoff | + | * A new version of the [[Orbit]] software implementing solid rocket boosters (SRBs) for terrestrial liftoff and a reusable parachute for atmospheric reentry. |
* A new, more comfortable [[EVA suit]]. | * A new, more comfortable [[EVA suit]]. | ||
+ | |||
+ | Red Dawn was also the final mission in the Hawking II. | ||
+ | |||
+ | ==Astronauts== | ||
+ | * [[Nevin Hotson]] ([[Habitat Commander]]) | ||
+ | * [[Anthony Xing]] ([[Subcommander]]) | ||
+ | * [[Daisy Wong]] ([[Medic]]) | ||
+ | * Maclean Rouble ([[Co-Pilot]]) | ||
+ | * [[Matthew Farkas-Dyck]] ([[Engineer]]) | ||
+ | * [[Ben Paul]] ([[Communications Specialist]]) | ||
==Experiments== | ==Experiments== | ||
Experiments were performed on the following subjects: | Experiments were performed on the following subjects: | ||
− | * | + | * effects of fatigue on mental ability |
− | * | + | * effects of music on mental ability and heart rate |
− | * | + | * effects of distracting stimuli on mental ability |
− | * | + | * effects of longterm exposure to the Martian environment on the Viking I lander |
− | Additionally, due to | + | |
+ | Additionally, due to the emergency situation of the loss of 30% of the [[Habitat]]'s water stores, an attempt was made to build a Sabatier reactor to produce additional water using the Martian atmosphere. This experiment was a partial success, as water was produced but could not be retrieved due to extreme weather conditions. | ||
+ | |||
− | |||
==Notable Events== | ==Notable Events== | ||
* CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February. | * CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February. | ||
− | * Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions | + | * Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions. |
* All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved. | * All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved. | ||
* A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor. | * A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor. | ||
Line 34: | Line 44: | ||
==See Also== | ==See Also== | ||
* [http://www.spacesim.org/Spacesim/Mission/mission(head_page).htm The Spacesim website page on this mission] | * [http://www.spacesim.org/Spacesim/Mission/mission(head_page).htm The Spacesim website page on this mission] | ||
+ | |||
+ | {{navm | ||
+ | |PrevMiss = Coronis 2007 | ||
+ | |NextMiss = Genesis 2009 | ||
+ | }} |
Latest revision as of 16:33, 31 May 2019
{{{missionpatch}}} | |
Red Dawn 2008 | |
---|---|
Year | 2007-08 |
Mission Destination | Mars |
Mission Dates | 26-02-2008 to 3-01-08 |
Habitat Commander | Nevin Hotson |
Subcommander | Anthony Xing |
Mission Control Commander | Jeff Gao |
Simulator Commander | Lyra Evans |
The 2008 Mission to Mars, or Mission Red Dawn, was the first mission run using the Engineering Closet and the new, smaller Hotlab. Other changes for this mission included:
- A new version of the Orbit software implementing solid rocket boosters (SRBs) for terrestrial liftoff and a reusable parachute for atmospheric reentry.
- A new, more comfortable EVA suit.
Red Dawn was also the final mission in the Hawking II.
Astronauts
- Nevin Hotson (Habitat Commander)
- Anthony Xing (Subcommander)
- Daisy Wong (Medic)
- Maclean Rouble (Co-Pilot)
- Matthew Farkas-Dyck (Engineer)
- Ben Paul (Communications Specialist)
Experiments
Experiments were performed on the following subjects:
- effects of fatigue on mental ability
- effects of music on mental ability and heart rate
- effects of distracting stimuli on mental ability
- effects of longterm exposure to the Martian environment on the Viking I lander
Additionally, due to the emergency situation of the loss of 30% of the Habitat's water stores, an attempt was made to build a Sabatier reactor to produce additional water using the Martian atmosphere. This experiment was a partial success, as water was produced but could not be retrieved due to extreme weather conditions.
Notable Events
- CJOH showed up without RSVPing several hours before launch, and some of the preparations were featured in a news segment on 26 February.
- Launch was only two hours behind schedule, which is believed to be a record for recent OCESS missions.
- All power to the main engines was briefly lost during the initial insertion to Earth orbit; however, the auxiliary power bus functioned properly, and a safe orbit was achieved.
- A total of five scheduled EVAs were performed, as well as several additional EVAs to repair damage and set up the Sabatier reactor.
- A powerful storm on the last night briefly incapacitated Cdr Hotson and Lt Rouble while they were on EVA to collect the water produced by the Sabatier reactor; however, Lt Cdr Xing was able to retrieve them safely.
- Landing at the OCESS facilities in Ottawa was at approximately 1415 EST; initial reentry was over Chicago, which was judged not to be an optimal landing site.
See Also
Previous Mission | This Mission | Next Mission |
---|---|---|
Coronis 2007 | Red Dawn 2008 | Genesis 2009 |