GNC (procedures)

From OCE Space Simulation
Jump to: navigation, search


GNC, is the officer in Mission Control responsible for observing the takeoff and landing of the Habitat.

FIDO

While GNC is responsible for takeoff and landing, FIDO is responsible for all other flight characteristics.

Equipment

  • GNC is allocated a computer in Mission Control
  • Orbit Telemetry Software (Flight Path Above Ground)
  • Transfer Orbit Calculator
  • FIDO acts as an assistant to GNC during takeoff and landing

Training

GNC should have certification in MC PILOT.

Launch Window

It is GNC's responsibility to determine an appropriate launch-window for the Habitat taking into account:

  • Mission Destination
  • Necessity to dock with AYSE or ISS

Landing Site

The landing site will have been chosen as part of the Mission Objectives, it is GNC's responsibility to determine the de-orbit burn necessary to land at that location.