Difference between revisions of "2013-14 Hibernation Official Logs"

From OCE Space Simulation
Jump to: navigation, search
(added day 3)
Line 179: Line 179:
 
|9:41 PM 2014-01-24
 
|9:41 PM 2014-01-24
 
|Beta simulation ended, situation file saved as ''' a2014aa '''
 
|Beta simulation ended, situation file saved as ''' a2014aa '''
 +
|}
 +
 +
== Day 2 ==
 +
{| class="wikitable"
 +
|-
 +
! Time
 +
! Entry
 +
|-
 +
| Fri Feb  7 18:49:03 2014
 +
| We have started all of our software.
 +
|-
 +
| Fri Feb  7 18:51:24 2014
 +
| Restarted EECOM and now we may control doors.
 +
|-
 +
| Fri Feb  7 18:53:09 2014
 +
| We have hot-started.
 +
|-
 +
| Fri Feb  7 18:59:32 2014
 +
| Mission Alpha Centauri Launch has been cleared.
 +
|-
 +
| Fri Feb  7 19:07:46 2014
 +
| We are on step nine of the procedures.
 +
|-
 +
| Fri Feb  7 19:08:22 2014
 +
| Permission to time accelerate has granted.
 +
|-
 +
| Fri Feb  7 19:11:52 2014
 +
| We are on step 21 of the procedures.
 +
|-
 +
| Fri Feb  7 19:18:46 2014
 +
| We are on step 26 of the procedures.
 +
|-
 +
| Fri Feb  7 19:20:28 2014
 +
| Lift-off has been confirmed.
 +
|-
 +
| Fri Feb  7 19:23:32 2014
 +
| Confusion referring to whether to extend radiators or not has been resolved.
 +
|-
 +
| Fri Feb  7 19:28:23 2014
 +
| During launch, we could not sustain engines of percent 90 without going over reactor temperatures to go above 120.
 +
|-
 +
| Fri Feb  7 19:30:30 2014
 +
| Apo apsis is nearing 3000.
 +
|-
 +
| Fri Feb  7 19:31:08 2014
 +
| Permission to time accelerate has been requested and given.
 +
|-
 +
| Fri Feb  7 19:33:07 2014
 +
| Circularizing orbit at 561.7 kilometers.
 +
|-
 +
| Fri Feb  7 19:37:10 2014
 +
| Time stamp of MC's EECOM is not synced.
 +
|-
 +
| Fri Feb  7 19:37:41 2014
 +
| Disregarded.
 +
|-
 +
| Fri Feb  7 19:38:43 2014
 +
| Drifting towards AYSE.
 +
|-
 +
| Fri Feb  7 19:44:32 2014
 +
| Time accelerating to cancel out vTan.
 +
|-
 +
| Fri Feb  7 20:03:37 2014
 +
| Docking with AYSE and radiators are stowed.
 +
|-
 +
| Fri Feb  7 20:05:29 2014
 +
| Docked with AYSE.
 +
|-
 +
| Fri Feb  7 20:18:15 2014
 +
| Stowaway has been found.
 +
|-
 +
| Fri Feb  7 20:22:12 2014
 +
| Best course of action is to return to earth with the stowaway.
 +
|-
 +
| Fri Feb  7 20:38:02 2014
 +
| MC suggests venting the stowaway in such a way that his body is incinerated.
 +
|-
 +
| Fri Feb  7 20:42:26 2014
 +
| We have decided to follow MC's plan.
 +
|-
 +
| Fri Feb  7 20:44:11 2014
 +
| We are going to keep the interlock vented for 5 minutes.
 +
|-
 +
| Fri Feb  7 20:58:32 2014
 +
| Going to vent the stowaway
 +
|-
 +
| Fri Feb  7 20:58:02 2014
 +
| Airlock vented with stowaway. Rest in peace.
 +
|-
 +
| Fri Feb  7 21:00:08 2014
 +
| Undocked from AYSE
 +
|-
 +
| Fri Feb  7 21:07:23 2014
 +
| Lt. Whitehead sent to the washroom by MC (?)
 +
|-
 +
| Fri Feb  7 21:10:05 2014
 +
| Waiting until theta pitch with Alpha Centauri is 0
 +
|-
 +
| Fri Feb  7 21:26:29 2014
 +
| Approaching escape burn
 +
|-
 +
| Fri Feb  7 21:28:02 2014
 +
| AYSE battery exploded
 +
|-
 +
| Fri Feb  7 21:54:59 2014
 +
| Now coasting and shutting down non-essential systems
 
|}
 
|}
  
 
[[Category: Official Logs]]
 
[[Category: Official Logs]]

Revision as of 00:13, 8 February 2014

These are official logs. You may be looking for 2013-14 Hibernation Unofficial Logs

The Mission

Mission to 
Alpha Centauri A (Placeholder)
Year 
2013-14

Day 1

Time Entry
7:45 PM 2014-01-24 The HAB has cold started, we have diverted a slight CO2 rise in the CNC, and all astros have reported for duty.
7:46 PM 2014-01-24 Water levels in the Hot Lab have increased and we are venting the Hot Lab.
7:47 PM 2014-01-24 Biocontaniments have been detected in the bathroom and disappeared.
7:48 PM 2014-01-24 Hot Lab pressure and water levels are rising rapidly. Mission Control has asked to send an astro to find source.
7:50 PM 2014-01-24 Astros have switched feeds to the hotlab, Mr. Billig has been sent to investigate.
7:53 PM 2014-01-24 Nothing has been discovered.
7:55 PM 2014-01-24 The same problem is happening again.
7:56 PM 2014-01-24 Commander Melanson has taken over CAPCOM. He is reasoning with Mission Control over how to diagnose the problem
7:59 PM 2014-01-24 Lt. Billig could not find the problem
8:02 PM 2014-01-24 Under advisory of MC, Spencer has replaced Lt. Billig in trying to find the problem of water levels rising in the hotlab
8:05 PM 2014-01-24 The problem has been identified as an open water bottle. Preparing to launch.
8:14 PM 2014-01-24 Time acceleration requested until HRT is 16 and decreasing.
8:14 PM 2014-01-24 Permission granted.
8:15 PM 2014-01-24 Water scrubbers not working in hot lab, but will not delay launch. Scrubbing CNC.
8:16 PM 2014-01-24 Permission to launch granted.
8:17 PM 2014-01-24 HAB launching. Activating SRB's.
8:18 PM 2014-01-24 Initiating 2 degrees counterclockwise roll.
8:19 PM 2014-01-24 Engines reduced to 60.
8:23 PM 2014-01-24 Injectors somehow were disabled. They have been reenabled.
8:25 PM 2014-01-24 We are not making orbit.
8:27 PM 2014-01-24 We are burning directly up.
8:28 PM 2014-01-24 VCen is -200 and increasing.
8:29 PM 2014-01-24 We are asking what orbit what we should be getting in. They respond 300 km.
8:34 PM 2014-01-24 MECO coasting to apoapsis.
8:35 PM 2014-01-24 MC has recorded HRT of 10.
8:37 PM 2014-01-24 Permission time accelerate into coast until apoapsis.
8:41 PM 2014-01-24 We have lost contact.
8:42 PM 2014-01-24 Lt. Billig has passed out on logs
8:44 PM 2014-01-24 CO2 levels have been at or below nominal levels for a while now
8:45 PM 2014-01-24 Lt. Billig has regained consciousness.
8:48 PM 2014-01-24 MC is not responding to our requests to clarify what "under AYSE" means.
8:49 PM 2014-01-24 MC is not responding to anything.
8:50 PM 2014-01-24 We are asking why we have wind in space by typing.
8:51 PM 2014-01-24 "Under ASYE" means HRT = 0
8:52 PM 2014-01-24 Communication is working, problem was microphone.
8:57 PM 2014-01-24 Mr. Billings has been moved to EECOM, Mr. Whitehead taking over logs
8:58 PM 2014-01-24 MC advises we do not scrub Airlock
9:00 PM 2014-01-24 Commander Melanson had stopped responding for a period of time, he has commenced responding again
9:01 PM 2014-01-24 Airlock pressure continuing to drop
9:02 PM 2014-01-24 Commander Melanson advises we ignore the issue for now
9:02 PM 2014-01-24 Approching HRT = 0
9:03 PM 2014-01-24 Commander Melanson is taking over piloting for the dock with AYSE
9:04 PM 2014-01-24 Lieutenant Kelly to take over logs
9:08 PM 2014-01-24 Lieutenant Whitehead has retaken control of logs
9:10 PM 2014-01-24 Once under AYSE under ayse, halt time acceleration, proceed with standard docking proceedures
9:13 PM 2014-01-24 Commencing time acceleration
9:14 PM 2014-01-24 Burning engines
9:16 PM 2014-01-24 Cutting engines
9:22 PM 2014-01-24 Requesting time acceleration carefully.
9:23 PM 2014-01-24 Time accelerating
9:23 PM 2014-01-24 Mission parameters have changed, simply docking with AYSE is the end goal of the simulation.
9:28 PM 2014-01-24 Getting quite close to AYSE
9:36 PM 2014-01-24 Hab has been rotated, 300 meters and approching to AYSE
9:39 PM 2014-01-24 We are in the process of docking with AYSE
9:40 PM 2014-01-24 Docked with Ayse
9:41 PM 2014-01-24 Beta simulation ended, situation file saved as a2014aa

Day 2

Time Entry
Fri Feb 7 18:49:03 2014 We have started all of our software.
Fri Feb 7 18:51:24 2014 Restarted EECOM and now we may control doors.
Fri Feb 7 18:53:09 2014 We have hot-started.
Fri Feb 7 18:59:32 2014 Mission Alpha Centauri Launch has been cleared.
Fri Feb 7 19:07:46 2014 We are on step nine of the procedures.
Fri Feb 7 19:08:22 2014 Permission to time accelerate has granted.
Fri Feb 7 19:11:52 2014 We are on step 21 of the procedures.
Fri Feb 7 19:18:46 2014 We are on step 26 of the procedures.
Fri Feb 7 19:20:28 2014 Lift-off has been confirmed.
Fri Feb 7 19:23:32 2014 Confusion referring to whether to extend radiators or not has been resolved.
Fri Feb 7 19:28:23 2014 During launch, we could not sustain engines of percent 90 without going over reactor temperatures to go above 120.
Fri Feb 7 19:30:30 2014 Apo apsis is nearing 3000.
Fri Feb 7 19:31:08 2014 Permission to time accelerate has been requested and given.
Fri Feb 7 19:33:07 2014 Circularizing orbit at 561.7 kilometers.
Fri Feb 7 19:37:10 2014 Time stamp of MC's EECOM is not synced.
Fri Feb 7 19:37:41 2014 Disregarded.
Fri Feb 7 19:38:43 2014 Drifting towards AYSE.
Fri Feb 7 19:44:32 2014 Time accelerating to cancel out vTan.
Fri Feb 7 20:03:37 2014 Docking with AYSE and radiators are stowed.
Fri Feb 7 20:05:29 2014 Docked with AYSE.
Fri Feb 7 20:18:15 2014 Stowaway has been found.
Fri Feb 7 20:22:12 2014 Best course of action is to return to earth with the stowaway.
Fri Feb 7 20:38:02 2014 MC suggests venting the stowaway in such a way that his body is incinerated.
Fri Feb 7 20:42:26 2014 We have decided to follow MC's plan.
Fri Feb 7 20:44:11 2014 We are going to keep the interlock vented for 5 minutes.
Fri Feb 7 20:58:32 2014 Going to vent the stowaway
Fri Feb 7 20:58:02 2014 Airlock vented with stowaway. Rest in peace.
Fri Feb 7 21:00:08 2014 Undocked from AYSE
Fri Feb 7 21:07:23 2014 Lt. Whitehead sent to the washroom by MC (?)
Fri Feb 7 21:10:05 2014 Waiting until theta pitch with Alpha Centauri is 0
Fri Feb 7 21:26:29 2014 Approaching escape burn
Fri Feb 7 21:28:02 2014 AYSE battery exploded
Fri Feb 7 21:54:59 2014 Now coasting and shutting down non-essential systems