Difference between revisions of "Preflight (procedures)"

From OCE Space Simulation
Jump to: navigation, search
Line 1: Line 1:
==2.1 Preflight Procedures==
+
== Preflight Procedures==
===2.1.1 General===
+
=== General===
 
The following procedures are to be performed by a combination of Flight Crew and Mission Control Staff prior to any instance the Habitat leaving a planet.
 
The following procedures are to be performed by a combination of Flight Crew and Mission Control Staff prior to any instance the Habitat leaving a planet.
  
===2.1.2 Order of Operations===
+
=== Order of Operations===
 
If departing Earth:
 
If departing Earth:
 
The following occur simultaneously:
 
The following occur simultaneously:
Line 18: Line 18:
 
*[[Preflight Procedures#2.1.6 Software Sync]]
 
*[[Preflight Procedures#2.1.6 Software Sync]]
  
===2.1.3 Equipment Check===
+
=== Equipment Check===
  
 
*Ensure all tools on the [[Tools Checklist]] are stowed in the Yellow Tool Box
 
*Ensure all tools on the [[Tools Checklist]] are stowed in the Yellow Tool Box
Line 35: Line 35:
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
  
===2.1.4 Medical Check===
+
=== Medical Check===
  
 
* Verify that each astronaut has attended any personal needs with regards to
 
* Verify that each astronaut has attended any personal needs with regards to
Line 45: Line 45:
  
 
* ''Astronauts are released to other duties''
 
* ''Astronauts are released to other duties''
 
+
 
* Compare biomed data to baseline and determine flight fitness of astronauts
 
* Compare biomed data to baseline and determine flight fitness of astronauts
  
Line 54: Line 54:
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
  
===2.1.5 Habitat Visual Inspection===
+
=== Habitat Visual Inspection===
  
 
* All astronauts excepting the Habitat Commander and, at the commander's digression, the Chief Engineer repair to C&C
 
* All astronauts excepting the Habitat Commander and, at the commander's digression, the Chief Engineer repair to C&C
Line 79: Line 79:
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
  
===2.1.6 Software Sync===
+
=== Software Sync===
 
* [[FLIGHT]] should inquire as to the status of the SERVER software on the Mezzanine.
 
* [[FLIGHT]] should inquire as to the status of the SERVER software on the Mezzanine.
 
* [[LOGS|MC-LOGS]] should initiate a MC Positions Check in accordance with [[MC-LOGS Procedures#1.7.5 Stations Check|MC-LOGS Procedures]].
 
* [[LOGS|MC-LOGS]] should initiate a MC Positions Check in accordance with [[MC-LOGS Procedures#1.7.5 Stations Check|MC-LOGS Procedures]].
Line 103: Line 103:
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
 
When all items are complete, inform FLIGHT and proceed to the following Preflight steps.
  
==2.1.7 Preflight Checklist==
+
== Preflight Checklist==
 
Only once all items on this checklist are crossed off can permission to launch be granted.
 
Only once all items on this checklist are crossed off can permission to launch be granted.
  
Line 129: Line 129:
 
# Actions visible on telemetry
 
# Actions visible on telemetry
  
==2.1.8 Tools Checklist==
+
== Tools Checklist==
 
The following tools must be present in the Yellow Tool Box stowed in the Engineering Closet.
 
The following tools must be present in the Yellow Tool Box stowed in the Engineering Closet.
  

Revision as of 15:26, 26 April 2013

Preflight Procedures

General

The following procedures are to be performed by a combination of Flight Crew and Mission Control Staff prior to any instance the Habitat leaving a planet.

Order of Operations

If departing Earth: The following occur simultaneously:

Afterwards:

If departing a non-Earth location:

Equipment Check

  • Ensure all tools on the Tools Checklist are stowed in the Yellow Tool Box
  • Replace Yellow Tool Box in Engineering Closet
  • Verify remaining stock of Hull Sealant (Drywall Compound)
  • Replace Hull Sealant container under the table in the Interlock
  • Verify remaining stock of Hull Replacement Panes (Drywall Sheets)
  • Replace Hull Replacement Panes in far corner of the Longhouse
  • Verify that four flashlights with batteries are in the Airlock
  • Verify that four full EVA Suits are in the Airlock

Unsuccessful Completion

If an item could not be completed, inform FLIGHT and await further instructions.

Successful Completion

When all items are complete, inform FLIGHT and proceed to the following Preflight steps.

Medical Check

  • Verify that each astronaut has attended any personal needs with regards to
    • Hydration
    • Nutrition
    • Waste Management
  • Take biomed data for each astronaut
  • Verify that astronauts are comfortable in uniform
  • Astronauts are released to other duties
  • Compare biomed data to baseline and determine flight fitness of astronauts

Unsuccessful Completion

If an item could not be completed, inform the Chief Flight Surgeon and await further instructions.

Successful Completion

When all items are complete, inform FLIGHT and proceed to the following Preflight steps.

Habitat Visual Inspection

  • All astronauts excepting the Habitat Commander and, at the commander's digression, the Chief Engineer repair to C&C
  • The Habitat Commander will verify that there are no anomalies in the habitat, and that all modules are sealed.
  • The Habitat Commander will further verify that all surfaces are clear of objects that might fall during takeoff
  • The Habitat Commander will further verify that the Interlock table is in the DOWN position
  • The Habitat Commander will further verify the cleanliness of the Hotlab

Order of Surveying

The Habitat Commander proceeds through the Habitat in the following manner:

  1. Longhouse
  2. Interlock
  3. Bathroom
  4. Airlock
  5. Hotlab
  6. Engineering Closet
  7. C&C

Unsuccessful Completion

If an anomaly was detected, inform FLIGHT and await further instructions.

Successful Completion

When all items are complete, inform FLIGHT and proceed to the following Preflight steps.

Software Sync

  • FLIGHT should inquire as to the status of the SERVER software on the Mezzanine.
  • MC-LOGS should initiate a MC Positions Check in accordance with MC-LOGS Procedures.
  • HAB-LOGS should initiate a Hab Positions Check in accordance with HAB-LOGS Procedures.
  • Mission Control will request the following statistics from the Habitat for comparison
    • Time Index (Pilot vs. GUIDO)
    • Outside Radiation (EECOM vs. EECOM)
    • Inside Radiation (EECOM vs. EECOM)
    • Habitat Fuel (ENG vs. ENG)
    • AYSE Fule (ENG vs. ENG)
    • Habitat Reactor Temp (ENG vs. ENG)
    • AYSE Reactor Temp (ENG vs. ENG)
    • Battery Life (2nd Bus) (ENG vs. ENG)
  • Mission Control will request the following actions from the Habitat
    • Toggle all ACC and ION on then off (ENG vs. ENG)
    • Toggle Fuel Cell Injector on then off (ENG vs. ENG)
    • Toggle Rad Shields On. Ramp to 30%. Ramp down. Turn off. (ENG vs. ENG)

Unsuccessful Completion

If an item could not be completed, inform FLIGHT and await further instructions.

Successful Completion

When all items are complete, inform FLIGHT and proceed to the following Preflight steps.

Preflight Checklist

Only once all items on this checklist are crossed off can permission to launch be granted.

Equipment

  1. Yellow Tool Box
  2. Hull Repair Material
  3. Airlock Equipment

Medical

  1. Personal Needs
  2. Biomeds acquired
  3. Comfort
  4. Flight Fitness

Inspection

  1. No Anomalies
  2. Interlock Counter clear
  3. Interlock Table clear and down
  4. Hotlab Clear
  5. Modules Sealed

Software

  1. SERVER online
  2. Matching stats
  3. Actions visible on telemetry

Tools Checklist

The following tools must be present in the Yellow Tool Box stowed in the Engineering Closet.

Tools

  1. 1 Hammer
  2. 2 sizes of Phillips
  3. 2 sizes of Roberson
  4. 2 sizes of Flathead
  5. 1 Pipe Wrench
  6. 1 Adjustable Spanner
  7. 1 Wood Saw
  8. 1 Hacksaw
  9. 2 sizes of Spatula
  10. 1 Soldering Iron

Consumables

  1. 1 box Drywall Screws (size)
  2. 1 box Wood Screws (size)
  3. 1 box Nails (size)
  4. 1 roll Solder
  5. 1 roll Drywall tape
  6. 1 roll Red electrical tape
  7. 2 rolls Duct Tape