*[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work
 
*[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work
*[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about it (specifics will be found out ASAP)
+
*[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about weather or not the motors were DC or AC
  
 
''Keyboards''
 
''Keyboards''

Revision as of 19:05, 29 November 2013

Events

Mini Mission

  • There was a mini mission for the moon takeoff procedure started and will be finished at a later date
    • Astros (who were sitting at the three new computers in MC)
      • Matt M. as hab commander and eecom monitor even though eecom isn't working
      • Wade was the pilot
      • Noah was the engineering
    • Mission Control
      • Larissa was monitoring orbit and helping Wade )majorly)
      • Dawn started out as MC commander but was replaced by Jared after she had to leave
      • Nathan was monitoring engineering
      • Spencer was monitoring eecom even though it isn't working

Hab drainage pipe

  • There was a successful test conducted
  • The edges for the holes are being smoothed out and it should be glued in place on November 29 2013

Rover

  • Jared and Maxim tested the motors and found out that they work
  • Arrian talked with Maxim about weather or not the motors were DC or AC

Keyboards

  • There are now 6 or 7 working keys on the panel above the engineering computer

Helmets

  • All of the fans are installed but not connected