Mission Alpha

From OCE Space Simulation
Revision as of 10:18, 12 February 2006 by TheKillerRabbit (Talk | contribs)

Jump to: navigation, search

A Mission Alpha is a dry run for the year's Main Mission. This year's Mission Alpha was Daedalus. Its destination was Venus.

Historical

Missions Alpha were typically run about 1 month before the actual mission, lasting about 4–6 hours in duration. The purpose was to test out all equipment, and discover any problems or areas lacking proper planning. It also was an excellent opportunity to test the level of training for both Astronauts and Mission Control staff.

In the 2001–2002 year, a Mission Beta was run. The Mission Alpha occured while the Habitat was still under construction, and as such a second dry run was needed closer to the mission date.


Mini-Missions

Mini-missions were historically an EEP activity for older classes. In recent years, Space Sim has taken to calling the dry-runs Mini-Missions instead of Mission Alpha.