Difference between revisions of "Mission Control Schedule"
From OCE Space Simulation
(made it) |
Darth Wombat (Talk | contribs) m (linked to Staffing Procedures) |
||
Line 1: | Line 1: | ||
− | The '''Mission Control Schedule''' is a schedule which contains information about when specific people will be at [[Mission Control]] during the Mission. This is to ensure an even distribution of people. | + | The '''Mission Control Schedule''' is a schedule which contains information about when specific people will be at [[Mission Control]] during the Mission. This is to ensure an even distribution of people. For information on how best to create this schedule, see [[Mission Control Staffing Procedures]]. |
− | + | ||
{{stub}} | {{stub}} |
Latest revision as of 23:28, 3 April 2010
The Mission Control Schedule is a schedule which contains information about when specific people will be at Mission Control during the Mission. This is to ensure an even distribution of people. For information on how best to create this schedule, see Mission Control Staffing Procedures.