Difference between revisions of "Habitat"

From OCE Space Simulation
Jump to: navigation, search
m (Fixed a broken link to the Albert Street location)
Line 14: Line 14:
 
they could fold up, while the Longhouse was a half-cylinder, framed with curved piping, and having a canvas overlayed on top.  Additionally, the Habitat had a [[Bathroom]] and an [[Airlock]].
 
they could fold up, while the Longhouse was a half-cylinder, framed with curved piping, and having a canvas overlayed on top.  Additionally, the Habitat had a [[Bathroom]] and an [[Airlock]].
  
The Habitat was set up in school gyms for at least one mission before it found its long-term home at the [[440 Albert Street|Old Ottawa Technical High School]].  In the late '90s, [[OCESS]] moved to the [[Media Centre|Bronson Street Media Centre]] as the [[OCDSB|School Board]] was going to shut down the Ottawa Technical High School.  The Habitat moved with Spacesim, but the old Airlock would not fit in the limited space.  A new, crawl-through airlock was built for this facility.
+
The Habitat was set up in school gyms for at least one mission before it found its long-term home at the [[440 Albert Street Administrative Centre|Old Ottawa Technical High School]].  In the late '90s, [[OCESS]] moved to the [[Media Centre|Bronson Street Media Centre]] as the [[OCDSB|School Board]] was going to shut down the Ottawa Technical High School.  The Habitat moved with Spacesim, but the old Airlock would not fit in the limited space.  A new, crawl-through airlock was built for this facility.
  
 
===Why the Habitat was Forced to Change===
 
===Why the Habitat was Forced to Change===
Spacesim continued undisturbed at the Media Centre until the Spring of [[2001]].  During this year, the Board decided to reclaim the Media Centre, and discourage SpaceSim from continueing.  One method of discouragement were random fire inspections.  the Board successfully deemed the Old Habitat a Fire Hazard.  [[OCESS]] managed to reclaim its old space at the Old Ottawa Technical High School, now known as the [[440 Albert street|Albert Street Administrative Centre]], but at the cost of constructing a new Habitat to meet Board specifications.   
+
Spacesim continued undisturbed at the Media Centre until the Spring of [[2001]].  During this year, the Board decided to reclaim the Media Centre, and discourage SpaceSim from continueing.  One method of discouragement were random fire inspections.  the Board successfully deemed the Old Habitat a Fire Hazard.  [[OCESS]] managed to reclaim its old space at the Old Ottawa Technical High School, now known as the [[440 Albert Street Administrative Centre]], but at the cost of constructing a new Habitat to meet Board specifications.   
  
 
The New Habitat would require to meet all building and safety codes, have official blueprints, and moreover have these blueprints stamped by a Professional Engineer.  Additionally electrical work had to be approved by a certified electritian.
 
The New Habitat would require to meet all building and safety codes, have official blueprints, and moreover have these blueprints stamped by a Professional Engineer.  Additionally electrical work had to be approved by a certified electritian.

Revision as of 15:13, 8 February 2006

Introduction

The Habitat is a space simulation facility. Its primary purpose is to simulate the living and work environment of the OCESS Astronauts while they execuse the mission. There have been two Habitats thus far.

The Habitat is often refered to simply as 'The Hab'.

History

The Hawking

The original Habitat was called The Hawking, named after famous physicist Steven Hawking.

The Hawking, as depected in Space

The original Habitat was first built in the Early '90s, and was designed to be collapsable. It constituted two primary rooms: the Interlock, and the Longhouse. The original Interlock was made from Wooden Walls, hinged together so that they could fold up, while the Longhouse was a half-cylinder, framed with curved piping, and having a canvas overlayed on top. Additionally, the Habitat had a Bathroom and an Airlock.

The Habitat was set up in school gyms for at least one mission before it found its long-term home at the Old Ottawa Technical High School. In the late '90s, OCESS moved to the Bronson Street Media Centre as the School Board was going to shut down the Ottawa Technical High School. The Habitat moved with Spacesim, but the old Airlock would not fit in the limited space. A new, crawl-through airlock was built for this facility.

Why the Habitat was Forced to Change

Spacesim continued undisturbed at the Media Centre until the Spring of 2001. During this year, the Board decided to reclaim the Media Centre, and discourage SpaceSim from continueing. One method of discouragement were random fire inspections. the Board successfully deemed the Old Habitat a Fire Hazard. OCESS managed to reclaim its old space at the Old Ottawa Technical High School, now known as the 440 Albert Street Administrative Centre, but at the cost of constructing a new Habitat to meet Board specifications.

The New Habitat would require to meet all building and safety codes, have official blueprints, and moreover have these blueprints stamped by a Professional Engineer. Additionally electrical work had to be approved by a certified electritian.

The New Habitat

the New Habitat was refered to as The New Habitat during construction, was shortly thereafter named The Hawking II, and finally was officially named The Brahe during the 2002-2003 year. Since then, this name does not appear to have stuck, and it is simply called The Hab.

The New Habitat was designed by Alex Ghosh, Ross Green, and Nikolas Zuchowicz, with strong influences from David Owen, who was then a recent alumnus. It was designed originally to be modular in design, with each room receiving its power through the Interlock, effectively "plugging in", so that the modules could be arranged in any orientation. The Interlock was designed to handle five sub-modules, and was supposed to have power and access doors for that many. Unfortunately, due to space constraints and electrical concerns, such a configuration became unfeasable, and the Habitat was locked into its current setup, and hardwired.

The Original Plans called for an Interlock, Hotlab, Bathroom, Longhouse, and Airlock. Construction took place during the Fall of 2001 and the Winter of 2002. The Longhouse was the first module to be finished, and was used for that year's Mission Alpha. The Hotlab was not constructed in time for The new Habitat's first mission, and instead was constructed during the 2002-2003 year.

Originally invisioned as being an aluminum sheet-metal structure, Drywall was selected as the material of choice for cost and safety concerns. The Drywall was easier and cheaper to repair, and emergency exists can be created anywhere as required.

Rooms

In The Hawking the Interlock served as living space and command centre for the Astronauts, containing their kitchen and control units. Additionally, the Airlock was off of the Interlock. The Longhouse was primarily used as a Laboratory, but was often used for sleeping space. The Longhouse connected the Bathroom to the Interlock.

Within the New Habitat, the Longhouse is dedicated to living space, while the scientific aspects have been split into a new HotLab. Originally planned to be the HotLab, the room connecting Interlock and Longhouse became the Bathroom. The new Hotlab is closer to the Planetary Surface allowing samples to be easily passed within. The only evidence of the old Hotlab within the Bathroom is some structural reinforcement around the location where a docking port for Robbie was supposed to go.


Environmental Simulation

The Habitat is simulated using software known as CMES. It keeps track of the temperature and pressure of all rooms, as well as the status on the doors and airlocks (open/closed).

The Habitat can be observed by Mission Control through a series of cameras.


Electrical System

The Habitat receives its power through the Interlock. There is a small power cabinet on the back wall.

See Also