Difference between revisions of "November 22 2013"

From OCE Space Simulation
Jump to: navigation, search
m
m
 
Line 10: Line 10:
 
***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly)
 
***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly)
 
***[[Kaeden Seburn|Kaeden]] started out as MC commander but was replaced by [[Jared Kelly|Jared]] after they had to leave
 
***[[Kaeden Seburn|Kaeden]] started out as MC commander but was replaced by [[Jared Kelly|Jared]] after they had to leave
***[[Emily Clarke|Nova]] was monitoring engineering
+
***[[Emily Clarke|Emily]] was monitoring engineering
 
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working
 
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working
  

Latest revision as of 16:44, 31 May 2019

Events

Mini Mission

  • There was a mini mission for the moon takeoff procedure started and will be finished at a later date
    • Astros (who were sitting at the three new computers in MC)
      • Matt M. as hab commander and eecom monitor even though eecom isn't working
      • Wade was the pilot
      • Noah was the engineering
    • Mission Control
      • Larissa was monitoring orbit and helping Wade )majorly)
      • Kaeden started out as MC commander but was replaced by Jared after they had to leave
      • Emily was monitoring engineering
      • Spencer was monitoring eecom even though it isn't working

Hab drainage pipe

  • There was a successful test conducted
  • The edges for the holes are being smoothed out and it should be glued in place on November 29 2013

Rover

  • Jared and Maxim tested the motors and found out that they work
  • Arrian talked with Maxim about weather or not the motors were DC or AC

Keyboards

  • There are now 6 or 7 working keys on the panel above the engineering computer

Helmets

  • All of the fans are installed but not connected