Line 9: | Line 9: | ||
**Mission Control | **Mission Control | ||
***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly) | ***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly) | ||
− | ***[[ | + | ***[[Kaeden Seburn|Kaeden]] started out as MC commander but was replaced by [[Jared Kelly|Jared]] after they had to leave |
***[[Nova Kelly| Nova]] was monitoring engineering | ***[[Nova Kelly| Nova]] was monitoring engineering | ||
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working | ***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working |
Revision as of 18:08, 27 November 2015
Events
Mini Mission
- There was a mini mission for the moon takeoff procedure started and will be finished at a later date
- Astros (who were sitting at the three new computers in MC)
- Mission Control
Hab drainage pipe
- There was a successful test conducted
- The edges for the holes are being smoothed out and it should be glued in place on November 29 2013
Rover
- Jared and Maxim tested the motors and found out that they work
- Arrian talked with Maxim about weather or not the motors were DC or AC
Keyboards
- There are now 6 or 7 working keys on the panel above the engineering computer
Helmets
- All of the fans are installed but not connected