Difference between revisions of "November 22 2013"
From OCE Space Simulation
Jared Kelly (Talk | contribs) (Updating category) |
Jared Kelly (Talk | contribs) m (Adding event) |
||
Line 24: | Line 24: | ||
*There are now 6 or 7 working keys on the panel above the engineering computer | *There are now 6 or 7 working keys on the panel above the engineering computer | ||
[[Category:Events and Attendance]] | [[Category:Events and Attendance]] | ||
+ | |||
+ | ''Helmets'' | ||
+ | *All of the fans are installed but not connected |
Revision as of 11:39, 25 November 2013
Events
Mini Mission
- There was a mini mission for the moon takeoff procedure started and will be finished at a later date
- Astros (who were sitting at the three new computers in MC)
- Mission Control
Hab drainage pipe
- There was a successful test conducted
- The edges for the holes are being smoothed out and it should be glued in place on November 29 2013
Rover
- Jared and Maxim tested the motors and found out that they work
- Arrian talked with Maxim about it (specifics will be found out ASAP)
Keboards
- There are now 6 or 7 working keys on the panel above the engineering computer
Helmets
- All of the fans are installed but not connected