Difference between revisions of "Talk:2009-10"

From OCE Space Simulation
Jump to: navigation, search
m
 
(28 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== Mission Debriefing Session ==
+
==Task Forces==
What follows is an account of the mission debriefing that took place at the March 5th work session.
+
This is why we should move the debrief notes from the talk page of the year article. I want to say something about the year article itself. Is the list of Task Forces in line with an official list? Because there was a lot of work that got done that doesn't appear on this list. For example, and obviously I have a bias, but I think that Door Panels belong on the list. Curtains, although I don't mean to downplay their importance or the accomplishment that was their successful and timely installation, probably took about 1/15th of the time that door panels took. If this doesn't follow an original list of official task forces, then I will add door panels and possibly engineering closet. - [[User:Darth Wombat|Darth Wombat]] 23:58, 12 March 2010 (EST)
 +
Ooh! And buzzers and phones! - [[User:Darth Wombat|Darth Wombat]] 20:19, 13 March 2010 (EST)
 +
:Yes, I'm aware of all those. I had a limited amount of time, and was just testing the templates myself. DIY, for chrissakes. That's the whole point of a wiki ---[[user:rubberchickenben|<font color="green">Benzyne]][[User_talk:Rubberchickenben|<sup>Talk Page</sup></font>]] 16:46, 14 March 2010 (EDT)
 +
:Not using talkpages is a beginner's mistake that I'm not about fall into. Thanks. - [[User:Darth Wombat|Darth Wombat]] 17:36, 14 March 2010 (EDT)
  
The participant responsible for each discussion point have been identified so that any misrepresentations can be corrected.  It is assumed that some earger spacesim member will take it upon themselves to reorganize this into a format to which other members can more easily add their thoughts and ideas.
+
==Debriefing==
 
+
*Available at [[Debriefing 2009-10]] ---[[user:rubberchickenben|<font color="green">Benzyne]][[User_talk:Rubberchickenben|<sup>Talk Page</sup></font>]] 11:06, 16 March 2010 (EDT)
The meeting was divided into a discussion of what we thought went well and what we were less happy with.  We mostly succeeded in following this plan.
+
 
+
 
+
 
+
== The Good Stuff ==
+
[[Maclean Rouble]]
+
*We were only 2 days late launching, better than last year.
+
*There were fewer glitches during the mission - the EECOM software had the most glitches.
+

Latest revision as of 10:06, 16 March 2010

Task Forces

This is why we should move the debrief notes from the talk page of the year article. I want to say something about the year article itself. Is the list of Task Forces in line with an official list? Because there was a lot of work that got done that doesn't appear on this list. For example, and obviously I have a bias, but I think that Door Panels belong on the list. Curtains, although I don't mean to downplay their importance or the accomplishment that was their successful and timely installation, probably took about 1/15th of the time that door panels took. If this doesn't follow an original list of official task forces, then I will add door panels and possibly engineering closet. - Darth Wombat 23:58, 12 March 2010 (EST) Ooh! And buzzers and phones! - Darth Wombat 20:19, 13 March 2010 (EST)

Yes, I'm aware of all those. I had a limited amount of time, and was just testing the templates myself. DIY, for chrissakes. That's the whole point of a wiki ---BenzyneTalk Page 16:46, 14 March 2010 (EDT)
Not using talkpages is a beginner's mistake that I'm not about fall into. Thanks. - Darth Wombat 17:36, 14 March 2010 (EDT)

Debriefing