Difference between revisions of "November 22 2013"
From OCE Space Simulation
Jared Kelly (Talk | contribs) m |
|||
Line 10: | Line 10: | ||
***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly) | ***[[Larissa Ulitsky|Larissa]] was monitoring orbit and helping Wade )majorly) | ||
***[[Dawn Sebourne|Dawn]] started out as MC commander but was replaced by [[Jared Kelly|Jared]] after she had to leave | ***[[Dawn Sebourne|Dawn]] started out as MC commander but was replaced by [[Jared Kelly|Jared]] after she had to leave | ||
− | ***[[ | + | ***[[Nova Kelly| Nova]] was monitoring engineering |
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working | ***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working | ||
Revision as of 19:32, 13 November 2015
Events
Mini Mission
- There was a mini mission for the moon takeoff procedure started and will be finished at a later date
- Astros (who were sitting at the three new computers in MC)
- Mission Control
Hab drainage pipe
- There was a successful test conducted
- The edges for the holes are being smoothed out and it should be glued in place on November 29 2013
Rover
- Jared and Maxim tested the motors and found out that they work
- Arrian talked with Maxim about weather or not the motors were DC or AC
Keyboards
- There are now 6 or 7 working keys on the panel above the engineering computer
Helmets
- All of the fans are installed but not connected