Difference between revisions of "October 25 2013"

From OCE Space Simulation
Jump to: navigation, search
 
(2 intermediate revisions by one other user not shown)
Line 16: Line 16:
 
Fire extingueshers happened with [[Jared Kelly|Jared]] and [[Matthew MacDonald|Matt M.]] <br />
 
Fire extingueshers happened with [[Jared Kelly|Jared]] and [[Matthew MacDonald|Matt M.]] <br />
 
Helmet taskforce practiced cutting holes in helmets<br />
 
Helmet taskforce practiced cutting holes in helmets<br />
Dawn cut the pipe hole for the sink drain<br />
+
Kaeden cut the pipe hole for the sink drain<br />
 
Daniel mapped the engineering controls (in progress)<br />
 
Daniel mapped the engineering controls (in progress)<br />
 
[[Phillip Eglin|Phil]] and [[Wade Theriault|Wade]] helped plumbing<br />
 
[[Phillip Eglin|Phil]] and [[Wade Theriault|Wade]] helped plumbing<br />
Line 22: Line 22:
 
Club photo was taken<br />
 
Club photo was taken<br />
 
Some people trained<br />
 
Some people trained<br />
 +
[[Category:Events and Attendance]]

Latest revision as of 19:54, 25 October 2015

Meeting

  • Club photo
  • Task forces:
    • Helmet improvement
    • Plumbing
    • Training
  • Directors Apps are out, director positions are:
    • Training
    • Resources
    • Webmaster
  • New responsibilities for some director positions
    • Webmaster is responsible for the creation of pages for each worksession
    • Director of Resources is responsible for recording the sign-in sheet (webmaster should ensure that the list is uploaded to each session's wiki page)

Events

Fire extingueshers happened with Jared and Matt M.
Helmet taskforce practiced cutting holes in helmets
Kaeden cut the pipe hole for the sink drain
Daniel mapped the engineering controls (in progress)
Phil and Wade helped plumbing
Patrick calculated formulas for ayse movement
Club photo was taken
Some people trained