Difference between revisions of "November 22 2013"
From OCE Space Simulation
Jared Kelly (Talk | contribs) m |
Jared Kelly (Talk | contribs) m |
||
Line 19: | Line 19: | ||
''Rover'' | ''Rover'' | ||
*[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work | *[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work | ||
− | *[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about | + | *[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about weather or not the motors were DC or AC |
''Keyboards'' | ''Keyboards'' |
Revision as of 18:05, 29 November 2013
Events
Mini Mission
- There was a mini mission for the moon takeoff procedure started and will be finished at a later date
- Astros (who were sitting at the three new computers in MC)
- Mission Control
Hab drainage pipe
- There was a successful test conducted
- The edges for the holes are being smoothed out and it should be glued in place on November 29 2013
Rover
- Jared and Maxim tested the motors and found out that they work
- Arrian talked with Maxim about weather or not the motors were DC or AC
Keyboards
- There are now 6 or 7 working keys on the panel above the engineering computer
Helmets
- All of the fans are installed but not connected