Difference between revisions of "November 22 2013"
From OCE Space Simulation
Jared Kelly (Talk | contribs) m |
Jared Kelly (Talk | contribs) (Updating category) |
||
Line 20: | Line 20: | ||
*[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work | *[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work | ||
*[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about it (specifics will be found out ASAP) | *[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about it (specifics will be found out ASAP) | ||
− | + | ||
− | + | ||
''Keboards'' | ''Keboards'' | ||
*There are now 6 or 7 working keys on the panel above the engineering computer | *There are now 6 or 7 working keys on the panel above the engineering computer | ||
+ | [[Category:Events and Attendance]] |
Revision as of 21:34, 24 November 2013
Events
Mini Mission
- There was a mini mission for the moon takeoff procedure started and will be finished at a later date
- Astros (who were sitting at the three new computers in MC)
- Mission Control
Hab drainage pipe
- There was a successful test conducted
- The edges for the holes are being smoothed out and it should be glued in place on November 29 2013
Rover
- Jared and Maxim tested the motors and found out that they work
- Arrian talked with Maxim about it (specifics will be found out ASAP)
Keboards
- There are now 6 or 7 working keys on the panel above the engineering computer