Talk:EECOM (procedures)
From OCE Space Simulation
(Redirected from Talk:EECOM Procedures)
LOX and LN2
We don't model LOX nor LN2. Should we? Stefanido 03:45, 1 September 2007 (EDT)
Limited supply?
Currently we have an unlimited supply of Oxygen, Nitrogen, Argon, etc... Should we institute limits in the software? (I vote yes.) If we do, then EECOM's procedures should change to allow them to give recommendations to Flight regarding aborts if supply of atmospherics so warrant. Stefanido 03:45, 1 September 2007 (EDT)
Electrical
All Electrical systems are in the Engineering software and not EECOM. Should EECOM also monitor Engineering, or should we give that to INCO as I have suggested on the Talk:INCO Procedures? Stefanido 12:49, 3 March 2010 (EST)
- EECOM as one station, Engineering as one station. INCO as it is currently described is defunct---Q-Cumber 15:53, 3 March 2010 (EST)